Expected Effect |
Effect when incoming/distribution panels are installed on the above-ground floors and interim floors
of the building
|
| |
Saving of the main wire of power (based on 1,500KVA of incoming capacity)
- Main wiring: Saving by about 16.5% compared with traditional method
- Construction cost: Saving by 22 million KRW (including labor cost)
|
| |
Shortened main route of wire reduces the electric loss caused by voltage drop. |
| |
Extended lifetime with prevention of humidity in the basement |
| |
Measure against basement submersion caused by unusual weather |
| |
Effect of environment-friendly facility when duplicated floor is applied |
| |
 |