Summary
Integrated operation and management using IT (T/S and UMPC)

Technique to reduce the upper area of architecture with reducing the height of outer box

Expected Effect
  • Saving effect by 20-30% in the outer box, material, manufacture, and labor costs
  • Saving effect by 50-60% in the copper bus bars of wiring (based on 1,500KVA)
  • Reduced upper area of architecture to one half
  • Effect when incoming/distribution panels are installed on the above-ground floors and interim floors
         of the building
  • Reduced back wiring work with use of PCB sequence circuit
  • Preparation of maintenance space between very high voltage panel and low voltage panel
  • Technique for simplification of purchase process with standardization

     
     
    Expected Effect
       Effect when incoming/distribution panels are installed on the above-ground floors and interim floors
          of the building
     
         Saving of the main wire of power (based on 1,500KVA of incoming capacity)
    - Main wiring: Saving by about 16.5% compared with traditional method
    - Construction cost: Saving by 22 million KRW (including labor cost)
     
         Shortened main route of wire reduces the electric loss caused by voltage drop.
     
         Extended lifetime with prevention of humidity in the basement
     
         Measure against basement submersion caused by unusual weather
     
         Effect of environment-friendly facility when duplicated floor is applied