Summary
Integrated operation and management using IT (T/S and UMPC)

Technique to reduce the upper area of architecture with reducing the height of outer box

Expected Effect
  • Saving effect by 20-30% in the outer box, material, manufacture, and labor costs
  • Saving effect by 50-60% in the copper bus bars of wiring (based on 1,500KVA)
  • Reduced upper area of architecture to one half
  • Effect when incoming/distribution panels are installed on the above-ground floors and interim floors
         of the building
  • Reduced back wiring work with use of PCB sequence circuit
  • Preparation of maintenance space between very high voltage panel and low voltage panel
  • Technique for simplification of purchase process with standardization

     
     
    Expected Effect
       Preparation of maintenance space between very high voltage panel and low voltage panel
     
         Overview
    - Preparation of about 600mm of distance to distinguished insulation between very high voltage
      and low voltage
    - Preparation of maintenance space to see at a position for internal inspection of distribution panel
    ΆΡ Patent registration: 10-0599558 (5 Jul 2006)

         Improved matter
    - Arrangement of protective section using transparent acryl plate to protect the insulation of facilities
     
        Expected effect
    - Maintenance of electric safety and operational sustainability with distinguishment between very
      high voltage panel and low voltage panel
    - Convenient and safe maintenance at a position with no need for opening all doors of distribution plate